Skip To Main Content

Proposition B

JHS Cafeteria and Kitchen Renovation & Expansion | $8.9M

Click here to watch the Facebook Live recording | Click here to view the presentation

Proposition B would include renovation and expansion updates to the cafeteria and kitchen at Joshua High School.

  • The current cafeteria at the high school was built in 1983 and has multiple levels in the dining area and kitchen, creating restrictions for the number of students that can eat during each of the school’s three lunch periods. The cafeteria can only hold up to 400 students during each lunch period and is near capacity, creating long lines and safety concerns.
  • The updates to the kitchen would include electrical, mechanical and plumbing infrastructure and modern equipment.
  • The kitchen area has two levels which poses a potential safety risk for cafeteria workers as they transport food and other supplies up and down a ramp that connects the different levels.

JHS Cafeteria